  • BASIN-WIDE URBAN PURVEYOR WATER DEMANDS

As a component of its Wastewater System Facilities Plan, the District adopted an Urban Water Management Plan (UWMP).  As recommended in the UWMP, the District plans to implement approximately $1.2 million in conservation measures within the collected area of the wastewater system.  Water production data from the UWMP, which was based on actual purveyor use from 1994 through 1999, will be used to forecast future water demand. Table ES-1 summarizes existing and future water production.

Table ES-1.
Existing and Build-Out Water Production for Urban Purveyors
Water Purveyor

Existing Average Daily
Production

Build-Out Average Daily
Production

(mgd) (ac-ft/year) (mgd) (ac-ft/year)
LOCSD 0.98 1,100 1.21 1,358
Cal Cities 0.92 1,030 1.29 1,452
S&T Mutual 0.14 150 0.14 150
Total Purveyor
Production
2.04 2,280 2.64 2,960
 

LOCSD water system demands were determined for existing conditions, and were used in the model to project system performance at build-out.  These demands are summarized in Table ES-2.

top

Table ES-2.  Summary of LOCSD Water System Demands
Demand Condition

LOCSD Water System Demands

Existing (MGD)5

Build-Out (MGD)

ADD5 0.98 1.21
MDD5 1.96 2.42
PHD5 3.43 (2,383 gpm) 4.24 (2,946 gpm)
Notes: 1. Existing demand based on historical records
2. build-Out demand based on 130 gpcd
3. MDD = ADD X 2.0
4. PHD = ADD X 3.5
5. ADD = Average Daily Demand
    MDD = Maximum Daily Demand
    PHD = Peak Hour Demand
    MGD = Million Gallons per Day